Our double wall corrugated pipe extrusion machine can produce pipe size range from Ø63-1200mm. Double wall corrugated pipe is mainly used for water drainage and ventilation. Usually, double wall corrugated pipe is PE material. But changing extruder type can produce PVC double wall corrugated pipe. We have three different types of corrugated pipe machine for your choice: horizontal type, vertical type and shuttle type.

If You Have Any Inquiry, Please Click The Button

Feel free to contact us anytime!

Double Wall Corrugated Pipe Production Line Parameter

ModelPipe Range (mm)Corrugator TypeOutput Capacity (kg/h)Main Motor Power (kw)
WPE16063 – 160Horizontal40055+45
WPE25075 – 250Horizontal400 – 520(55+45) – (75+55)
WPE400200 – 400Horizontal740 – 1080(110+75) – (160+110)
WPE600200 – 600Vertical / Shuttle1080 – 1440(160+110) – (200+160)
WPE800200 – 800Vertical / Shuttle1520 – 1850(220+160) – (280+200)
WPE1200400 – 1200Vertical / Shuttle1850 – 2300(280+200) – (355+280)

Advantage of Double Wall Corrugated Pipe

  • Strong resistance to external pressure: the outer layer has a ring-shaped corrugated structure, which greatly enhances the ring stiffness of the pipe, thereby enhancing the resistance of the pipe to soil loads. In this performance, double-wall corrugated pipe has obvious advantages compared with other pipes.
  • Low cost: under the same ring stiffness requirements, double-wall corrugated pipes only need thinner pipe walls to meet the requirements. Therefore, compared with solid-wall pipes in same material and specifications, it can save about half of the raw materials, so the cost of double-wall corrugated pipes is also lower.
  • Convenient construction: as the double-wall corrugated pipe is light in weight, it is easy to transport and connect, so the construction is quick and the maintenance is simple.
  • The friction coefficient is small and the flow rate is large. The double-wall corrugated pipe made of HDPE material has good low temperature resistance and impact resistance.
  • Good chemical stability: The double-wall corrugated pipe is made of plastic materials, such as HDPE, PP, PVC. These plastic materials have good chemical stability.
  • Long service life: The service life of the double-wall corrugated pipe can reach more than 50 years under normal use.
  • Excellent wear resistance: tests have proved that the wear resistance of double wall corrugated pipe is even several times higher than that of steel pipe.
  • Appropriate degree of deflection: certain length of double-wall corrugated pipe can be slightly deflected when aligned, and will not be affected by a certain degree of uneven ground sedimentation. It can be directly laid in a slightly non-straight groove without pipe fittings.

Application of Double Wall Corrugated Pipe

DWC Pipe Ventilation
Ventilation
DWC Pipe Irrigation
Irrigation
DWC Pipe Drainage
Drainage
DWC Pipe Cable Protection
Cable Protection

Double Wall Corrugated Pipe Connection

Pipe Socket Connection
DWC Pipe Fittings
Pipe Fittings

Double Wall Corrugated Pipe Manufacturing Process Flow Chart

Process Flow

  • Process 1: Plastic granules and other additives weighed proportionally, and then loaded to mixer. After mixing material will be transported into single screw extruder.
  • Process 2: There are two extuders, one is for inner layer and the other is for outer layer. Raw materials will be heated, melted, further mixed and plasticized inside screw and barrel of extruder. Plasticized melt will be pushed by screw and move into the flow channel of die head.
  • Process 3: The die head is also with heating function. Heated melt will flow through flow channel inside die head. Outer layer and inner layer come out from die head. Calibration sleeve is installed at end of die head. During production, calibration sleeve will insert into corrugator. Inner layer touches with calibration sleeve to form inner layer of the pipe.
  • Process 4: Corrugated mould is installed inside corrugator. Outer layer from the die head will touches the corrugated mould. Vacuum is created between outer layer and corrugated mould. Then outer layer wave shape is formed and cooled by the corrugated mould. spigot (for big size) and socket are also formed by the corrugated mould in the corrugator. Corrugator also provide pulling force to move pipe to cooling tank.
  • Process 5: For corrugated pipe machine, cooling tank provide auxiliary cooling and traction. It will make pipe move smoothly into cutter.
  • Cutter is equipped with two blades. Two blades working at same time to cut the transition part between socket and corrugated wave. Then pipe will move to the stacker for unload.

Units of Double Wall Corrugated Pipe Extrusion Line

Single Screw Extruder

Adopt L/D ratio 38:1 screw for virgin material. Adopt L/D 33:1 screw for recycled material. We also have choice of twin screw and barrel for other material such PVC powder, PP powder, etc. Provide suitable extruder for different customer requirements.

Die Head and Calibration Sleeve

Both outer layer and inner layer are extruded inside die head. Each material flow channel inside die head is placed evenly. Each channel is after heat treatment and mirror polishing to ensure material flow smoothly. Also die head provides compressed air between both layer.

Corrugator and Corrugated Mould

Corrugator is used to place and move corrugated mould. Vacuum is created to absorb outer layer into corrugated mould to form corrugate shape. By moving corrugated mould, pipe is also pulled out from corrugator.

Cooling Tank

Cooling tank is used to cool pipe further.

Cutter

Cutter controlled by Siemens PLC, double knife cutter. Equipped with precise inspection device ensures the cutter accurately placing at the correct position of double wall corrugated pipe. Whole cutting process is accurate and fully automatic.

Stacker

To support and unload pipes. Length of stacker can be customized.

Double Wall Corrugated Pipe Making Machine Price (Based on Your Requirements)

We have different model for double wall corrugated pipe making machine with different capacity to produce different sizes of double wall corrugated pipes.
In addition to the machinery price, it is recommended that you need to know the investment amount of the entire project.

Extrusion Machine

Extrusion machine is most important factor to consider. Because the choice of other component will be based on the extrusion machine. According to your requirement, we will provide you the machinery price with exact machine configuration.

Auxiliary Machinery

Auxiliary machinery are necessary to make extrusion machine working. For example, suitable transformer is required to provide electricity; chiller is needed to provide cooling water; air compressor is necessary to provide compressed air. In addition, mixer, crusher, etc. are used to mix material and recycle scrap material.

Factory Building

According to the machinery information, we will recommend you the space of workshop to install and operate the extrusion machine and its auxiliary machinery. You can calculate the workshop cost based on our information.

Workers

We will give recommendation of number and types of workers required to make extrusion machine running. For example, how many operators and ordinary workers.

Raw Material

We will also recommend the spare raw material you need to prepare. Because it is necessary to have some raw material in stock in order to make extrusion machine continuous running and you can have enough time to purchase additional raw material.

Besides total investment cost, our sales engineer can also provide cost and profit analysis, and show you how many days you need to recover total investment cost. So you can check the feasibility of the project. So please contact with our sales engineer to know the exact machinery cost, total investment cost and project feasibility.

Double Wall Corrugated Pipe Manufacturing Plant Layout

Our company will provide detailed machine layout. We can also plant layout according to your workshop drawing.

Our layout is customized based on different size of double wall corrugated pipe machine and customer workshop.
Below is important information which we will show in the plant layout according to you workshop drawing:

Transformer Position

According to your workshop drawing, we will arrange extrusion machine based on the original transformer position. Or if you do not have transformer yet, we will recommend suitable transformer position.

Water Tank Position

Water tank is necessary to provide continuous cooling water to the extrusion machine. We will consider the water tank location to make water circulation smoothly between machine and water tank.

Air Compressor

Usually, we recommend to locate air compressor away from the extrusion machine because of the big noise created by the air compressor during its working. We will allocate the good position of air compressor according to your workshop drawing.

Trench

Trench is located beside the extrusion machinery. It has conduit pipe, air pipe , water supply pipe and water drainage pipe inside. You can also choose not to have trench.

Together with plant layout, our company will provide electrical drawing and machine manual.